Federal Register

Federal Register
Author :
Publisher :
Total Pages : 198
Release :
ISBN-10 : OSU:32437122751742
ISBN-13 :
Rating : 4/5 (42 Downloads)

Synopsis Federal Register by :

Federal Register Index

Federal Register Index
Author :
Publisher :
Total Pages : 712
Release :
ISBN-10 : MINN:31951P009943757
ISBN-13 :
Rating : 4/5 (57 Downloads)

Synopsis Federal Register Index by :

Final Staff Assessment and Draft Environmental Impact Statement and Draft California Desert Conservation Area Plan Amendment, Ivanpah Solar Electric Generating System

Final Staff Assessment and Draft Environmental Impact Statement and Draft California Desert Conservation Area Plan Amendment, Ivanpah Solar Electric Generating System
Author :
Publisher :
Total Pages :
Release :
ISBN-10 : OCLC:471534765
ISBN-13 :
Rating : 4/5 (65 Downloads)

Synopsis Final Staff Assessment and Draft Environmental Impact Statement and Draft California Desert Conservation Area Plan Amendment, Ivanpah Solar Electric Generating System by : California Energy Commission. Siting Office

Draft Environmental Impact Statement and Draft Plan Amendment to the California Desert Conservation Area Plan for the Proposed Desert Sunlight Solar Farm Project : for the Palm Springs - South Coast Field Office

Draft Environmental Impact Statement and Draft Plan Amendment to the California Desert Conservation Area Plan for the Proposed Desert Sunlight Solar Farm Project : for the Palm Springs - South Coast Field Office
Author :
Publisher :
Total Pages :
Release :
ISBN-10 : OCLC:900011680
ISBN-13 :
Rating : 4/5 (80 Downloads)

Synopsis Draft Environmental Impact Statement and Draft Plan Amendment to the California Desert Conservation Area Plan for the Proposed Desert Sunlight Solar Farm Project : for the Palm Springs - South Coast Field Office by :

Desert Sunlight Holdings, LLC (Sunlight or Applicant), a wholly owned subsidiary of First Solar Development, Inc. (First Solar), proposes to construct and operate a 550-megawatt (MW), nominal capacity, alternating current (AC), solar photovoltaic (PV), energy-generating project known as the Desert Sunlight Solar Farm (DSSF). The Project consists of the PV generating facility (Solar Farm), most of the corridor for the associated 220-kilovolt (kV) generation interconnection transmission line (Gen-Tie Line), and one of two potential sites being considered for a new substation. The Project would be located on lands administered by the US Department of the Interior (DOI), Bureau of Land Management (BLM), Palm Springs-South Coast Field Office. The Project would develop a new 500- to 220- (500/220- ) kV substation (referred to herein as the Red Bluff Substation), where the PV generating facility would interconnect with the Southern California Edison (SCE) regional transmission system.

Subsea Mineral Resources

Subsea Mineral Resources
Author :
Publisher :
Total Pages : 128
Release :
ISBN-10 : UVA:35007007122546
ISBN-13 :
Rating : 4/5 (46 Downloads)

Synopsis Subsea Mineral Resources by : Vincent Ellis McKelvey

Draft Environmental Impact Statement and Draft Plan Amendment to the California Desert Conservation Area Plan for the Proposed Desert Sunlight Solar Farm Project

Draft Environmental Impact Statement and Draft Plan Amendment to the California Desert Conservation Area Plan for the Proposed Desert Sunlight Solar Farm Project
Author :
Publisher :
Total Pages :
Release :
ISBN-10 : OCLC:900011680
ISBN-13 :
Rating : 4/5 (80 Downloads)

Synopsis Draft Environmental Impact Statement and Draft Plan Amendment to the California Desert Conservation Area Plan for the Proposed Desert Sunlight Solar Farm Project by : United States. Bureau of Land Management. Palm Springs Field Office

Desert Sunlight Holdings, LLC (Sunlight or Applicant), a wholly owned subsidiary of First Solar Development, Inc. (First Solar), proposes to construct and operate a 550-megawatt (MW), nominal capacity, alternating current (AC), solar photovoltaic (PV), energy-generating project known as the Desert Sunlight Solar Farm (DSSF). The Project consists of the PV generating facility (Solar Farm), most of the corridor for the associated 220-kilovolt (kV) generation interconnection transmission line (Gen-Tie Line), and one of two potential sites being considered for a new substation. The Project would be located on lands administered by the US Department of the Interior (DOI), Bureau of Land Management (BLM), Palm Springs-South Coast Field Office. The Project would develop a new 500- to 220- (500/220-) kV substation (referred to herein as the Red Bluff Substation), where the PV generating facility would interconnect with the Southern California Edison (SCE) regional transmission system.

Waste Not, Want Not

Waste Not, Want Not
Author :
Publisher :
Total Pages : 165
Release :
ISBN-10 : 1893790096
ISBN-13 : 9781893790094
Rating : 4/5 (96 Downloads)

Synopsis Waste Not, Want Not by : Peter H. Gleick