Schultz-Hanford Area Transmission Line Project Draft Environmental Impact Statement

Schultz-Hanford Area Transmission Line Project Draft Environmental Impact Statement
Author :
Publisher :
Total Pages : 5
Release :
ISBN-10 : OCLC:68493796
ISBN-13 :
Rating : 4/5 (96 Downloads)

Synopsis Schultz-Hanford Area Transmission Line Project Draft Environmental Impact Statement by :

This summary covers the major points of the Draft Environmental Impact Statement (EIS) prepared for the BPA Schultz-Hanford Transmission Project proposed by the Bonneville Power Administration (BPA). The project involves constructing a new 500-kilovolt (kV) line in central Washington, north of Hanford. The new line would connect to an existing line at the Schultz Substation near Ellensburg and to a new or existing substation in the Hanford area (see Map 2 in EIS). The project may also involve constructing a new substation to accommodate the new transmission line. As a federal agency, BPA is required by the National Environmental Policy Act (NEPA) to take into account potential environmental consequences of its proposal and take action to protect, restore, and enhance the environment during and after construction. Preparation of this EIS assists in meeting those requirements.

Federal Register

Federal Register
Author :
Publisher :
Total Pages : 682
Release :
ISBN-10 : COLUMBIA:CU14245990
ISBN-13 :
Rating : 4/5 (90 Downloads)

Synopsis Federal Register by :

Sutter Basin Pilot Feasibility Final Report

Sutter Basin Pilot Feasibility Final Report
Author :
Publisher :
Total Pages : 1314
Release :
ISBN-10 : STANFORD:36105050677645
ISBN-13 :
Rating : 4/5 (45 Downloads)

Synopsis Sutter Basin Pilot Feasibility Final Report by : United States. Office of the Assistant Secretary of the Army (Civil Works)