Remedial Action Plan and Site Conceptual Design for Stabilization of the Inactive Uranium Mill Tailings Site at Ambrosia Lake, New Mexico. Volume 1, Text, Appendices A, B, and C

Remedial Action Plan and Site Conceptual Design for Stabilization of the Inactive Uranium Mill Tailings Site at Ambrosia Lake, New Mexico. Volume 1, Text, Appendices A, B, and C
Author :
Publisher :
Total Pages :
Release :
ISBN-10 : OCLC:1065956519
ISBN-13 :
Rating : 4/5 (19 Downloads)

Synopsis Remedial Action Plan and Site Conceptual Design for Stabilization of the Inactive Uranium Mill Tailings Site at Ambrosia Lake, New Mexico. Volume 1, Text, Appendices A, B, and C by :

This Remedial Action Plan (RAP) has been developed to serve a dual purpose. It presents the series of activities that is proposed by the US Department of Energy (DOE) to stabilize and control radioactive materials at the inactive Phillips/United Nuclear uranium processing site designated as the Ambrosia Lake site in McKinley County, New Mexico. It also serves to document the concurrence of both State of New Mexico and the US Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by the DOE and the state and concurrence by NRC, becomes Appendix B of the Cooperative Agreement.

Energy Research Abstracts

Energy Research Abstracts
Author :
Publisher :
Total Pages : 654
Release :
ISBN-10 : MSU:31293011519018
ISBN-13 :
Rating : 4/5 (18 Downloads)

Synopsis Energy Research Abstracts by :

Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site at Mexican Hat, Utah

Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site at Mexican Hat, Utah
Author :
Publisher :
Total Pages : 137
Release :
ISBN-10 : OCLC:68410963
ISBN-13 :
Rating : 4/5 (63 Downloads)

Synopsis Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site at Mexican Hat, Utah by :

This Remedial Action Plan (RAP) has been developed to serve a two- fold purpose. It presents the activities proposed by the Department of Energy (DOE) to accomplish long-term stabilization and control of the residual radioactive materials (RRM) from Monument Valley Arizona, and Mexican Hat, Utah, at the Mexican Hat disposal site. It also serves to document the concurrence of both the Navajo Nation and the Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by DOE and the Navajo Nation and concurrence by the NRC, becomes Appendix B of the Cooperative Agreement. This document has been structured to provide a comprehensive understanding of the remedial action proposed for the Monument Valley and Mexican Hat sites. It includes specific design and construction requirements for the remedial action. Pertinent information and data are included with reference given to the supporting documents. Appendices A, B, and C are provided as part of this document. Appendix A presents regulatory compliance issues, Appendix B provides details of the engineering design, and Appendix C presents the radiological support plan.

Modification to the Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site at Mexican Hat, Utah

Modification to the Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site at Mexican Hat, Utah
Author :
Publisher :
Total Pages : 249
Release :
ISBN-10 : OCLC:68411140
ISBN-13 :
Rating : 4/5 (40 Downloads)

Synopsis Modification to the Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site at Mexican Hat, Utah by :

This document provides the modifications to the 1988 Remedial Action Plan (RAP) of the contaminated materials at the Monument Valley, Arizona, and Mexican Hat, Utah. The text detailing the modifications and attachments 1 through 6 are provided with this document. The RAP was developed to serve a two-fold purpose. It presents the activities proposed by the Department of Energy (DOE) to accomplish long-term stabilization and control of the residual radioactive materials (RRM) from Monument Valley, Arizona, and Mexican Hat, Utah, at the Mexican Hat disposal site. It also serves to document the concurrence of both the Navajo Nation and the Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by DOE and the Navajo Nation and concurrence by the NRC, becomes Appendix B of the Cooperative Agreement. This document has been structured to provide a comprehensive understanding of the remedial action proposed for the Monument Valley and Mexican Hat sites. It includes specific design and construction requirements for the remedial action. Pertinent information and data are included with reference given to the supporting documents.

HWHM '90

HWHM '90
Author :
Publisher :
Total Pages : 518
Release :
ISBN-10 : 0944989918
ISBN-13 : 9780944989913
Rating : 4/5 (18 Downloads)

Synopsis HWHM '90 by : Hazardous Materials Control Research Institute

Remedial Action Plan for Stabilization of the Inactive Uranium Mill Tailings Site at Monument Valley, Arizona

Remedial Action Plan for Stabilization of the Inactive Uranium Mill Tailings Site at Monument Valley, Arizona
Author :
Publisher :
Total Pages : 202
Release :
ISBN-10 : OCLC:68380569
ISBN-13 :
Rating : 4/5 (69 Downloads)

Synopsis Remedial Action Plan for Stabilization of the Inactive Uranium Mill Tailings Site at Monument Valley, Arizona by :

This Remedial Action Plan (RAP) has been developed to serve a two-fold purpose. It presents the series of activities which are proposed by the U.S. Department of Energy (DOE) to accomplish long-term stabilization and control of radioactive materials at the inactive uranium processing site located near Monument Valley, Arizona It also serves to document the concurrence of both the Navajo Nation and the U.S. Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by DOE and the Navajo Nation and concurrence by NRC, becomes Appendix B of the Cooperative Agreement.

Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site at Lowman, Idaho. Attachment 4, Water Resources Protection Strategy

Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site at Lowman, Idaho. Attachment 4, Water Resources Protection Strategy
Author :
Publisher :
Total Pages : 29
Release :
ISBN-10 : OCLC:727208172
ISBN-13 :
Rating : 4/5 (72 Downloads)

Synopsis Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site at Lowman, Idaho. Attachment 4, Water Resources Protection Strategy by :

The DOE proposes to achieve compliance with the proposed EPA groundwater protection standards (Subparts A and B of 40 CFR 192) by meeting the EPA maximum concentration limits (MCLs) or background concentrations for designated hazardous constituents in groundwater in the uppermost aquifer (alluvium/weathered granodiorite) at the point of compliance (POC) at the Lowman disposal site near Lowman, Idaho. The proposed remedial action in conjunction with existing hydrogeological conditions at the Lowman site will ensure sufficient protection of human health and the environment. The DOE has concluded that the EPA groundwater protection standards will be met at the POC because, with the exception of antimony, none of the hazardous constituents that exceed laboratory method detection limits within the radioactive sand pore fluids were above the proposed concentration limits. The DOE has demonstrated that antimony will meet the proposed concentration limits at the POC through attenuation in subsoils beneath the disposal cell and by dilution in groundwater underflow. The Lowman processing site is in compliance with Subpart B of 40 CFR 192 because statistical analyses of groundwater samples indicate no groundwater contamination.