Transportation

Transportation
Author :
Publisher : BiblioGov
Total Pages : 154
Release :
ISBN-10 : 1289121974
ISBN-13 : 9781289121976
Rating : 4/5 (74 Downloads)

Synopsis Transportation by : U S Government Accountability Office (G

The Northeast Corridor Improvement Project (NECIP) to improve rail passenger service between Boston, New York, and Washington, D.C. will not be completed within the established time and funding limits. A review was made of the project's management and planning which contributed to these problems. Previous audits have raised serious questions about the accuracy, reliability, and validity of many Amtrak NECIP activities. Amtrak's performance on NECIP construction work has not been good. Work has consistently run behind production schedules while exceeding cost estimates. The scope of work for NECIP has been reduced from that originally intended in the draft implementation master plan. These reductions will result in increased future maintenance costs for Amtrak, reduced passenger comfort, reduced on-time reliability, and reduced safety. Shortcomings in NECIP management have resulted in numerous problems. The three party management structure is not working effectively and has contributed to the problems. The Federal Railroad Administration (FRA) is the overall program manager and has the final authority and responsibility for the entire program. However, FRA has not been effective, and major overall decisions and determinations have not been made.

Problems in the Northeast Corridor Railway Improvement Project

Problems in the Northeast Corridor Railway Improvement Project
Author :
Publisher :
Total Pages : 133
Release :
ISBN-10 : OCLC:640375408
ISBN-13 :
Rating : 4/5 (08 Downloads)

Synopsis Problems in the Northeast Corridor Railway Improvement Project by : United States. General Accounting Office

The Northeast Corridor Improvement Project (NECIP) to improve rail passenger service between Boston, New York, and Washington, D.C. will not be completed within the established time and funding limits. A review was made of the project's management and planning which contributed to these problems. Previous audits have raised serious questions about the accuracy, reliability, and validity of many Amtrak NECIP activities. Amtrak's performance on NECIP construction work has not been good. Work has consistently run behind production schedules while exceeding cost estimates. The scope of work for NECIP has been reduced from that originally intended in the draft implementation master plan. These reductions will result in increased future maintenance costs for Amtrak, reduced passenger comfort, reduced on-time reliability, and reduced safety. Shortcomings in NECIP management have resulted in numerous problems. The three party management structure is not working effectively and has contributed to the problems. The Federal Railroad Administration (FRA) is the overall program manager and has the final authority and responsibility for the entire program. However, FRA has not been effective, and major overall decisions and determinations have not been made.

Final Programmatic Environmental Impact Statement

Final Programmatic Environmental Impact Statement
Author :
Publisher :
Total Pages : 412
Release :
ISBN-10 : MINN:31951D033919516
ISBN-13 :
Rating : 4/5 (16 Downloads)

Synopsis Final Programmatic Environmental Impact Statement by : Northeast Corridor Project (U.S.)

Northeast Corridor Improvement Project

Northeast Corridor Improvement Project
Author :
Publisher :
Total Pages : 20
Release :
ISBN-10 : NWU:35556030826630
ISBN-13 :
Rating : 4/5 (30 Downloads)

Synopsis Northeast Corridor Improvement Project by : Northeast Corridor Project (U.S.)

Rail Service Commuter Problems on the Northeast Corridor

Rail Service Commuter Problems on the Northeast Corridor
Author :
Publisher :
Total Pages : 248
Release :
ISBN-10 : STANFORD:36105110712986
ISBN-13 :
Rating : 4/5 (86 Downloads)

Synopsis Rail Service Commuter Problems on the Northeast Corridor by : United States. Congress. House. Committee on Interstate and Foreign Commerce. Subcommittee on Transportation and Commerce

In Harmony with the Environment

In Harmony with the Environment
Author :
Publisher :
Total Pages : 22
Release :
ISBN-10 : IND:30000066269196
ISBN-13 :
Rating : 4/5 (96 Downloads)

Synopsis In Harmony with the Environment by : United States. Federal Railroad Administration

Northeast Corridor Improvement Project

Northeast Corridor Improvement Project
Author :
Publisher :
Total Pages : 180
Release :
ISBN-10 : LOC:00183872655
ISBN-13 :
Rating : 4/5 (55 Downloads)

Synopsis Northeast Corridor Improvement Project by : United States. Congress. House. Committee on Interstate and Foreign Commerce. Subcommittee on Transportation and Commerce