Interim Remedial Measure Work Plan For Tar Well Removal At The East Station
Download Interim Remedial Measure Work Plan For Tar Well Removal At The East Station full books in PDF, epub, and Kindle. Read online free Interim Remedial Measure Work Plan For Tar Well Removal At The East Station ebook anywhere anytime directly on your device. Fast Download speed and no annoying ads.
Author |
: Ishwar Murarka |
Publisher |
: |
Total Pages |
: |
Release |
: 2004 |
ISBN-10 |
: OCLC:62385069 |
ISBN-13 |
: |
Rating |
: 4/5 (69 Downloads) |
Synopsis Interim Remedial Measure Work Plan for Tar Well Removal at the East Station by : Ishwar Murarka
Author |
: New York (State). Dept. of Health |
Publisher |
: |
Total Pages |
: |
Release |
: 2005 |
ISBN-10 |
: OCLC:503213677 |
ISBN-13 |
: |
Rating |
: 4/5 (77 Downloads) |
Synopsis Interim Remedial Measures Work Plan for Removal of Coal Tar Impacted Soil on Washington Street Between W. Court and Cascadilla Streets by : New York (State). Dept. of Health
This is the final work plan for the removal and disposal of coal tar impacted soil that exists along the west side of Washington St., between W. Court and Cascadilla Streets in the city of Ithaca, New York. This area was contaminated by the subsurface wooden ducts on W. Court St. that transported coal tar from the Court Street Former Manufactured Gas Plant Site. The work plan describes the techniques to be utilized for the sampling, community air monitoring, excavation, material handling, waste characterization, transportation and disposal of coal tar impacted soil and materials.
Author |
: Rochester Gas and Electric Corporation |
Publisher |
: |
Total Pages |
: |
Release |
: 2006 |
ISBN-10 |
: OCLC:123913921 |
ISBN-13 |
: |
Rating |
: 4/5 (21 Downloads) |
Synopsis Final Work Plan for Characterization and Design of Interim Remedial Measure for the Oil-tar Separator Area for the RG&E West Station Former Mgp Site, Rochester, New York by : Rochester Gas and Electric Corporation
Author |
: New York State Electric and Gas Corporation |
Publisher |
: |
Total Pages |
: |
Release |
: 2005 |
ISBN-10 |
: OCLC:503209302 |
ISBN-13 |
: |
Rating |
: 4/5 (02 Downloads) |
Synopsis Draft Interim Remedial Measures Work Plan for Removal of Coal Tar Impacted Soil on Washington Street Between W. Court and Cascadilla Streets by : New York State Electric and Gas Corporation
This document describes the draft work plan for the removal and disposal of coal tar impacted soil that exists along the west side of Washington Street, between W. Court and Cascadilla Streets in the City of Ithaca, New York. This area was contaminated by the subsurface wooden ducts on W. Court St. that transported coal tar from the Court Street former manufactured gas plant site to tar wells located at the Cayuga Inlet coal tar transfer site. The Work Plan describes the techniques to be utilized for the sampling, community air monitoring, excavation, material handling, waste characterization, transportation and disposal of coal tar impacted soil and materials.
Author |
: Peak Environmental Management, Inc |
Publisher |
: |
Total Pages |
: |
Release |
: 2006 |
ISBN-10 |
: OCLC:77743529 |
ISBN-13 |
: |
Rating |
: 4/5 (29 Downloads) |
Synopsis Work Plan by : Peak Environmental Management, Inc
Author |
: Illinois Power Company |
Publisher |
: |
Total Pages |
: |
Release |
: 1997 |
ISBN-10 |
: OCLC:218220169 |
ISBN-13 |
: |
Rating |
: 4/5 (69 Downloads) |
Synopsis Interim Remedial Measures Work Plan by : Illinois Power Company
Author |
: Illinois Power Company |
Publisher |
: |
Total Pages |
: 46 |
Release |
: 1999 |
ISBN-10 |
: OCLC:883404219 |
ISBN-13 |
: |
Rating |
: 4/5 (19 Downloads) |
Synopsis Interim Remedial Measures Work Plan by : Illinois Power Company
Author |
: C & S Engineers, Inc |
Publisher |
: |
Total Pages |
: |
Release |
: 2012 |
ISBN-10 |
: OCLC:857903897 |
ISBN-13 |
: |
Rating |
: 4/5 (97 Downloads) |
Synopsis Remedial Investigation/interim Remedial Measures Work Plan by : C & S Engineers, Inc
Author |
: New York State Electric and Gas Corporation |
Publisher |
: |
Total Pages |
: |
Release |
: 2001 |
ISBN-10 |
: OCLC:503198262 |
ISBN-13 |
: |
Rating |
: 4/5 (62 Downloads) |
Synopsis Interim Remedial Measures Final Engineering Report for Activities at Ithaca Court Street Former Manufactured Gas Plant Site, City of Ithaca, Tompkins County, New York by : New York State Electric and Gas Corporation
This report documents the implementation of the approved remedial measures at the Ithaca Court Street Former MGP Site, City of Ithaca, Tompkins County, New York. The remedial work can be characterized as controlled removal and disposal of contaminated water, soil and coal tar associated with two underground former tar storage vessels. This work was proposed in a document titled Interim Remedial Measures Work Plan, which was reviewed and approved by the New York State Dept. of Environmental Conservation.
Author |
: O'Brien & Gere |
Publisher |
: |
Total Pages |
: |
Release |
: 2003 |
ISBN-10 |
: OCLC:907681206 |
ISBN-13 |
: |
Rating |
: 4/5 (06 Downloads) |
Synopsis Final Work Plan, East Flume Interim Remedial Measure by : O'Brien & Gere