Section 103 Detailed Project Report and Environmental Assessment

Section 103 Detailed Project Report and Environmental Assessment
Author :
Publisher :
Total Pages :
Release :
ISBN-10 : OCLC:312486826
ISBN-13 :
Rating : 4/5 (26 Downloads)

Synopsis Section 103 Detailed Project Report and Environmental Assessment by :

The purpose of this study was to define the beach erosion, storm wave damage, and related coastal problems along the shore at St. Joseph Sound at the city of Dunedin, Florida; and to determine the most practical, economical, and least environmentally damaging methods of alleviating those problems. The study disclosed that Federal participation in the construction of beach erosion control works along the city's 0.8 mile of bay shore is warranted. The selected plan provides protection and stabilization along 4,100 feet of eroding shore by construction of a Florida limerock revetment.

Section 103

Section 103
Author :
Publisher :
Total Pages :
Release :
ISBN-10 : OCLC:1108681552
ISBN-13 :
Rating : 4/5 (52 Downloads)

Synopsis Section 103 by : United States. Army. Corps of Engineers. Jacksonville District

Detailed Project Report and Environmental Assessment, Shoreline Protection Study, Section 103 of the 1962 River and Harbor Act

Detailed Project Report and Environmental Assessment, Shoreline Protection Study, Section 103 of the 1962 River and Harbor Act
Author :
Publisher :
Total Pages : 376
Release :
ISBN-10 : OCLC:320530235
ISBN-13 :
Rating : 4/5 (35 Downloads)

Synopsis Detailed Project Report and Environmental Assessment, Shoreline Protection Study, Section 103 of the 1962 River and Harbor Act by : United States. Army. Corps of Engineers. Buffalo District