East Channel of Upper Mississippi River Long-term Maintenance Plan for Federal Harbor and Permit Application to Construct and Expand Barge Terminal Facilities, Prairie Du Chien

East Channel of Upper Mississippi River Long-term Maintenance Plan for Federal Harbor and Permit Application to Construct and Expand Barge Terminal Facilities, Prairie Du Chien
Author :
Publisher :
Total Pages : 274
Release :
ISBN-10 : NWU:35556031030075
ISBN-13 :
Rating : 4/5 (75 Downloads)

Synopsis East Channel of Upper Mississippi River Long-term Maintenance Plan for Federal Harbor and Permit Application to Construct and Expand Barge Terminal Facilities, Prairie Du Chien by :

Wisconsin Public Documents

Wisconsin Public Documents
Author :
Publisher :
Total Pages : 400
Release :
ISBN-10 : OSU:32435056423973
ISBN-13 :
Rating : 4/5 (73 Downloads)

Synopsis Wisconsin Public Documents by :

Long-Term Channel Maintenance Plan for the Federal Commercial Harbor and a Permit Application to Construct and Expand Barge Terminal Facilities in the East Channel of the Upper Mississippi River at Prairie Du Chien, Wisconsin

Long-Term Channel Maintenance Plan for the Federal Commercial Harbor and a Permit Application to Construct and Expand Barge Terminal Facilities in the East Channel of the Upper Mississippi River at Prairie Du Chien, Wisconsin
Author :
Publisher :
Total Pages : 424
Release :
ISBN-10 : OCLC:227834650
ISBN-13 :
Rating : 4/5 (50 Downloads)

Synopsis Long-Term Channel Maintenance Plan for the Federal Commercial Harbor and a Permit Application to Construct and Expand Barge Terminal Facilities in the East Channel of the Upper Mississippi River at Prairie Du Chien, Wisconsin by :

The purpose of this document is to analyze the environmental impacts of a proposed permit action to upgrade and expand an existing barge transloading facility at St. Feriole Island for Prairie Sand and Gravel Inc., and the Corps of Engineers proposed Long-Term Channel Maintenance Plan for the federal commercial harbor in the East Channel of the Mississippi River at Prairie du Chien. The purpose of the proposed actions is to provide for environmentally sustainable public and/or private commercial navigation, including harbor and terminal facilities, in the East Channel of the Mississippi River at Prairie du Chien to meet the need for continued growth and development. A variety of alternatives were developed and evaluated, four of which are evaluated in detail. The following significant resources would be affected by the proposed activities: (1) Freshwater mussels; (2) Federal and state-listed threatened and endangered mussel species; (3) cultural resources; (4) Mississippi River nine-foot channel project; (5) Upper Mississippi River Wildlife and Fish Refuge and (6) Wisconsin and Southern Railroad (W & SRR).

EIS Cumulative

EIS Cumulative
Author :
Publisher :
Total Pages : 330
Release :
ISBN-10 : UOM:39015042128341
ISBN-13 :
Rating : 4/5 (41 Downloads)

Synopsis EIS Cumulative by :

The Waterways Journal

The Waterways Journal
Author :
Publisher :
Total Pages : 436
Release :
ISBN-10 : STANFORD:36105029370074
ISBN-13 :
Rating : 4/5 (74 Downloads)

Synopsis The Waterways Journal by :

River of History

River of History
Author :
Publisher :
Total Pages : 208
Release :
ISBN-10 : MINN:31951D02480906N
ISBN-13 :
Rating : 4/5 (6N Downloads)

Synopsis River of History by : John O. Anfinson

Engineers Far from Ordinary

Engineers Far from Ordinary
Author :
Publisher :
Total Pages : 444
Release :
ISBN-10 : 1782663444
ISBN-13 : 9781782663447
Rating : 4/5 (44 Downloads)

Synopsis Engineers Far from Ordinary by : Damon Manders

Includes full color maps and photographs.