Design and construction: Bull.1. General features. Bull.2. Boulder Dam. Bull.5. Penstocks and outlet pipes. Bull.6. Imperial Dam and desilting works

Design and construction: Bull.1. General features. Bull.2. Boulder Dam. Bull.5. Penstocks and outlet pipes. Bull.6. Imperial Dam and desilting works
Author :
Publisher :
Total Pages : 426
Release :
ISBN-10 : UFL:31262044103132
ISBN-13 :
Rating : 4/5 (32 Downloads)

Synopsis Design and construction: Bull.1. General features. Bull.2. Boulder Dam. Bull.5. Penstocks and outlet pipes. Bull.6. Imperial Dam and desilting works by : United States. Bureau of Reclamation

Design and construction: Bull.1. General features. Bull.2. Boulder Dam. Bull.5. Penstocks and outlet pipes. Bull.6. Imperial Dam and desilting works

Design and construction: Bull.1. General features. Bull.2. Boulder Dam. Bull.5. Penstocks and outlet pipes. Bull.6. Imperial Dam and desilting works
Author :
Publisher :
Total Pages : 0
Release :
ISBN-10 : LCCN:43000176
ISBN-13 :
Rating : 4/5 (76 Downloads)

Synopsis Design and construction: Bull.1. General features. Bull.2. Boulder Dam. Bull.5. Penstocks and outlet pipes. Bull.6. Imperial Dam and desilting works by : United States. Bureau of Reclamation

Boulder Canyon Project: Design and construction: Bull. 1. General features. Bull. 2. Boulder Dam. Bull. 5. Penstocks and outlet pipes. Bull. 6. Imperial Dam and desilting works

Boulder Canyon Project: Design and construction: Bull. 1. General features. Bull. 2. Boulder Dam. Bull. 5. Penstocks and outlet pipes. Bull. 6. Imperial Dam and desilting works
Author :
Publisher :
Total Pages : 962
Release :
ISBN-10 : UCAL:B4236588
ISBN-13 :
Rating : 4/5 (88 Downloads)

Synopsis Boulder Canyon Project: Design and construction: Bull. 1. General features. Bull. 2. Boulder Dam. Bull. 5. Penstocks and outlet pipes. Bull. 6. Imperial Dam and desilting works by : United States. Bureau of Reclamation

Design and construction: Bull.1. General features. Bull.2. Boulder Dam. Bull.5. Penstocks and outlet pipes. Bull.6. Imperial Dam and desilting works

Design and construction: Bull.1. General features. Bull.2. Boulder Dam. Bull.5. Penstocks and outlet pipes. Bull.6. Imperial Dam and desilting works
Author :
Publisher :
Total Pages : 434
Release :
ISBN-10 : UOM:39015068079394
ISBN-13 :
Rating : 4/5 (94 Downloads)

Synopsis Design and construction: Bull.1. General features. Bull.2. Boulder Dam. Bull.5. Penstocks and outlet pipes. Bull.6. Imperial Dam and desilting works by : United States. Bureau of Reclamation

Technical investigations: Bull.1. Trial load method of analyzing arch dams. Bull.2. Slab analogy experiments. Bull.3. Model tests of Boulder Dam. Bull.4. Stress studies for Boulder Dam. Bull.5. Penstock analysis and stiffener design. Bull.6. Model tests of arch and cantilever elements

Technical investigations: Bull.1. Trial load method of analyzing arch dams. Bull.2. Slab analogy experiments. Bull.3. Model tests of Boulder Dam. Bull.4. Stress studies for Boulder Dam. Bull.5. Penstock analysis and stiffener design. Bull.6. Model tests of arch and cantilever elements
Author :
Publisher :
Total Pages : 288
Release :
ISBN-10 : RUTGERS:39030035796731
ISBN-13 :
Rating : 4/5 (31 Downloads)

Synopsis Technical investigations: Bull.1. Trial load method of analyzing arch dams. Bull.2. Slab analogy experiments. Bull.3. Model tests of Boulder Dam. Bull.4. Stress studies for Boulder Dam. Bull.5. Penstock analysis and stiffener design. Bull.6. Model tests of arch and cantilever elements by : United States. Bureau of Reclamation

Technical investigations: Bull.1. Trial load method of analyzing arch dams. Bull.2. Slab analogy experiments. Bull.3. Model tests of Boulder Dam. Bull.4. Stress studies for Boulder Dam. Bull.5. Penstock analysis and stiffener design. Bull.6. Model tests of arch and cantilever elements

Technical investigations: Bull.1. Trial load method of analyzing arch dams. Bull.2. Slab analogy experiments. Bull.3. Model tests of Boulder Dam. Bull.4. Stress studies for Boulder Dam. Bull.5. Penstock analysis and stiffener design. Bull.6. Model tests of arch and cantilever elements
Author :
Publisher :
Total Pages : 278
Release :
ISBN-10 : MSU:31293010805509
ISBN-13 :
Rating : 4/5 (09 Downloads)

Synopsis Technical investigations: Bull.1. Trial load method of analyzing arch dams. Bull.2. Slab analogy experiments. Bull.3. Model tests of Boulder Dam. Bull.4. Stress studies for Boulder Dam. Bull.5. Penstock analysis and stiffener design. Bull.6. Model tests of arch and cantilever elements by : United States. Bureau of Reclamation

Hydraulic investigations: Bull.1. Model studies of spillways. Bull.2. Model studies of penstocks and outlet works. Bull.3. Studies of crests for overfall dams. Bull.4. Model studies of Imperial Dam, desilting works, all-American canal structures

Hydraulic investigations: Bull.1. Model studies of spillways. Bull.2. Model studies of penstocks and outlet works. Bull.3. Studies of crests for overfall dams. Bull.4. Model studies of Imperial Dam, desilting works, all-American canal structures
Author :
Publisher :
Total Pages : 210
Release :
ISBN-10 : UOM:39015068182578
ISBN-13 :
Rating : 4/5 (78 Downloads)

Synopsis Hydraulic investigations: Bull.1. Model studies of spillways. Bull.2. Model studies of penstocks and outlet works. Bull.3. Studies of crests for overfall dams. Bull.4. Model studies of Imperial Dam, desilting works, all-American canal structures by : United States. Bureau of Reclamation

Kokuritsu Kokkai Toshokan zosho mokuroku

Kokuritsu Kokkai Toshokan zosho mokuroku
Author :
Publisher :
Total Pages : 1316
Release :
ISBN-10 : UFL:31262051362340
ISBN-13 :
Rating : 4/5 (40 Downloads)

Synopsis Kokuritsu Kokkai Toshokan zosho mokuroku by : Kokuritsu Kokkai Toshokan Japan

Kokuritsu Kokkai Toshokan zōsho mokuroku

Kokuritsu Kokkai Toshokan zōsho mokuroku
Author :
Publisher :
Total Pages : 1316
Release :
ISBN-10 : UOM:39015039653343
ISBN-13 :
Rating : 4/5 (43 Downloads)

Synopsis Kokuritsu Kokkai Toshokan zōsho mokuroku by : Kokuritsu Kokkai Toshokan (Japan)