Comprehensive Report of the Clinch River Study

Comprehensive Report of the Clinch River Study
Author :
Publisher :
Total Pages : 121
Release :
ISBN-10 : OCLC:30851015
ISBN-13 :
Rating : 4/5 (15 Downloads)

Synopsis Comprehensive Report of the Clinch River Study by : Clinch River Study Steering Committee

Status Report[s] on Clinch River Study

Status Report[s] on Clinch River Study
Author :
Publisher :
Total Pages : 136
Release :
ISBN-10 : UOM:39015009665079
ISBN-13 :
Rating : 4/5 (79 Downloads)

Synopsis Status Report[s] on Clinch River Study by : Clinch River Study Steering Committee

Status Report[s] on Clinch River Study

Status Report[s] on Clinch River Study
Author :
Publisher :
Total Pages : 130
Release :
ISBN-10 : UOM:39015009665004
ISBN-13 :
Rating : 4/5 (04 Downloads)

Synopsis Status Report[s] on Clinch River Study by : Clinch River Study Steering Committee

Remedial Investigation/feasibility Study for the Clinch River/Poplar Creek Operable Unit. Volume 2. Appendixes A, B, C, D.

Remedial Investigation/feasibility Study for the Clinch River/Poplar Creek Operable Unit. Volume 2. Appendixes A, B, C, D.
Author :
Publisher :
Total Pages :
Release :
ISBN-10 : OCLC:68376290
ISBN-13 :
Rating : 4/5 (90 Downloads)

Synopsis Remedial Investigation/feasibility Study for the Clinch River/Poplar Creek Operable Unit. Volume 2. Appendixes A, B, C, D. by :

This document contains appendices A (water characterization), B (sediment characterization), C (biota Characterization), D (applicable or relevant and appropriate requirements) from the combined Remedial Investigation/Feasibility Study Report for the Clinch River/Poplar Crack (CR/PC) Operable Unit (OU). The CR/PC OU is located in Anderson and Roane Counties, Tennessee and consists of the Clinch River and several of its embayments in Melton Hill and Watts Bar Reservoirs. These waters have received hazardous substances released over a period of 50 years from the US Department of Energy's Oak Ridge Reservation (ORR), a National Priority List site established under the Comprehensive Environmental Response, Compensation, and Liability Act. A remedial investigation has been conducted to determine the current nature and extent of any contamination and to assess the resulting risk to human health and the environment. The feasibility study evaluates remedial action alternatives to identify any that are feasible for implementation and that would effectively reduce risk. Historical studies had indicated that current problems would likely include[sup 137]Cs in sediment of the Clinch River, mercury in sediment and fish of Poplar Creek and PCBs and pesticides in fish from throughout the OU. Peak releases of mercury and[sup 137]Cs occurred over 35 years ago, and current releases are low. Past releases of PCBs from the ORR are poorly quantified, and current releases are difficult to quantify because levels are so low. The site characterization focused on contaminants in surface water, sediment, and biota. Contaminants in surface water were all found to be below Ambient Water Quality Criteria. Other findings included the following: elevated metals including cesium 137 and mercury in McCoy Branch sediments; PCBs and chlordane elevated in several fish species, presenting the only major human health risk, significant ecological risks in Poplar Creek but not in the Clinch River.

Hearings and Reports on Atomic Energy

Hearings and Reports on Atomic Energy
Author :
Publisher :
Total Pages : 1218
Release :
ISBN-10 : CHI:28281652
ISBN-13 :
Rating : 4/5 (52 Downloads)

Synopsis Hearings and Reports on Atomic Energy by : United States. Congress. Joint Committee on Atomic Energy

Geological Survey Professional Paper

Geological Survey Professional Paper
Author :
Publisher :
Total Pages : 408
Release :
ISBN-10 : STANFORD:36105007748515
ISBN-13 :
Rating : 4/5 (15 Downloads)

Synopsis Geological Survey Professional Paper by : Geological Survey (U.S.)

Remedial Investigation/feasibility Study of the Clinch River/Poplar Creek Operable Unit. Volume 4. Information Related to the Feasibility Study and ARARs. Appendixes G, H, I.

Remedial Investigation/feasibility Study of the Clinch River/Poplar Creek Operable Unit. Volume 4. Information Related to the Feasibility Study and ARARs. Appendixes G, H, I.
Author :
Publisher :
Total Pages : 72
Release :
ISBN-10 : OCLC:894198613
ISBN-13 :
Rating : 4/5 (13 Downloads)

Synopsis Remedial Investigation/feasibility Study of the Clinch River/Poplar Creek Operable Unit. Volume 4. Information Related to the Feasibility Study and ARARs. Appendixes G, H, I. by :

This report presents the findings of an investigation into contamination of the Clinch River and Poplar Creek near the U.S. Department of Energy's (DOE's) Oak Ridge Reservation (ORR) in eastern Tennessee. For more than 50 years, various hazardous and radioactive substances have been released to the environment as a result of operations and waste management activities at the ORR. In 1989, the ORR was placed on the National Priorities List (NPL), established and maintained under the federal Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under CERCLA, NPL sites must be investigated to determine the nature and extent of contamination at the site, assess the risk to human health and the environment posed by the site, and, if necessary, identify feasible remedial alternatives that could be used to clean the site and reduce risk. To facilitate the overall environmental restoration effort at the ORR, CERCLA activities are being implemented individually as distinct operable units (OUs). This document is the combined Remedial Investigation and Feasibility Study Report for the Clinch River/Poplar Creek OU.