A Summary Of The Phase Ii Title I Engineering Assessment Of Inactive Uranium Mill Tailings
Download A Summary Of The Phase Ii Title I Engineering Assessment Of Inactive Uranium Mill Tailings full books in PDF, epub, and Kindle. Read online free A Summary Of The Phase Ii Title I Engineering Assessment Of Inactive Uranium Mill Tailings ebook anywhere anytime directly on your device. Fast Download speed and no annoying ads.
Author |
: Ford, Bacon & Davis Utah Inc |
Publisher |
: |
Total Pages |
: 36 |
Release |
: 1976 |
ISBN-10 |
: OCLC:32356658 |
ISBN-13 |
: |
Rating |
: 4/5 (58 Downloads) |
Synopsis A Summary of the Phase II - Title I Engineering Assessment of Inactive Uranium Mill Tailings by : Ford, Bacon & Davis Utah Inc
Author |
: |
Publisher |
: |
Total Pages |
: 100 |
Release |
: 1977 |
ISBN-10 |
: UOM:39015095271162 |
ISBN-13 |
: |
Rating |
: 4/5 (62 Downloads) |
Synopsis A Summary of the Phase II - Title I Engineering Assessment of Inactive Uranium Mill Tailings by :
Author |
: |
Publisher |
: |
Total Pages |
: |
Release |
: 1977 |
ISBN-10 |
: OCLC:1029769336 |
ISBN-13 |
: |
Rating |
: 4/5 (36 Downloads) |
Synopsis A Summary of the Phase II - Title I Engineering Assessment of Inactive Uranium Mill Tailings by :
Author |
: |
Publisher |
: |
Total Pages |
: |
Release |
: 1977 |
ISBN-10 |
: OCLC:1255714531 |
ISBN-13 |
: |
Rating |
: 4/5 (31 Downloads) |
Synopsis A Summary of the Phase II - Title I Engineering Assessment of Inactive Uranium Mill Tailings by :
Author |
: |
Publisher |
: |
Total Pages |
: 256 |
Release |
: 1977 |
ISBN-10 |
: UOM:39015095271188 |
ISBN-13 |
: |
Rating |
: 4/5 (88 Downloads) |
Synopsis Phase II - Title I Engineering Assessment of Inactive Uranium Mill Tailings, Gunnison Site, Gunnison, Colorado by :
Author |
: |
Publisher |
: |
Total Pages |
: |
Release |
: 1977 |
ISBN-10 |
: OCLC:925449594 |
ISBN-13 |
: |
Rating |
: 4/5 (94 Downloads) |
Synopsis Summary of the Phase II, Title I Engineering Assessment of Inactive Uranium Mill Tailings, Spook Site, Converse County, Wyoming by :
An engineering assessment was performed of the problems resulting from the existence of radioactive uranium mill tailings at the Riverton, Wyoming site. The services include: the performance of core drillings; soil, water and other sample analyses; radiometric measurements to determine areas with radium-contaminated materials; the evaluation of resulting radiation exposures of individuals and nearby populations; the investigation of site geology, hydrology, and meteorology; and the evaluation and costing of alternative corrective actions. Radon gas release from the 900,000 tons of tailings at the Riverton site constitutes the main environmental impact. The two alternative actions presented are fencing and maintenance of the site and off-site remedial action and decontamination of the millsite and ore storage areas and additional stabilization cover to a minimum of 2 ft. The cost estimates for the options are $460,000 and $1,140,000, respectively. Estimated costs for moving the tailings and all contaminated materials to unspecified sites 5 and 10 mi from the present location are $6,000,000 and $6,400,000, respectively.
Author |
: |
Publisher |
: |
Total Pages |
: |
Release |
: 1977 |
ISBN-10 |
: OCLC:1029838551 |
ISBN-13 |
: |
Rating |
: 4/5 (51 Downloads) |
Synopsis A Summary of the Phase II - Title I Engineering Assessment of Inactive Uranium Mill Tailings by :
Author |
: Ford, Bacon & Davis Utah Inc |
Publisher |
: |
Total Pages |
: 23 |
Release |
: 1977 |
ISBN-10 |
: OCLC:13714768 |
ISBN-13 |
: |
Rating |
: 4/5 (68 Downloads) |
Synopsis A Summary of the Phase II - Title I Engineering Assessment of Inactive Uranium Mill Tailings by : Ford, Bacon & Davis Utah Inc
Author |
: |
Publisher |
: |
Total Pages |
: |
Release |
: 1977 |
ISBN-10 |
: OCLC:1029838552 |
ISBN-13 |
: |
Rating |
: 4/5 (52 Downloads) |
Synopsis A Summary of the Phase II - Title I Engineering Assessment of Inactive Uranium Mill Tailings by :
Author |
: Ford, Bacon & Davis Utah Inc |
Publisher |
: |
Total Pages |
: 25 |
Release |
: 1977 |
ISBN-10 |
: OCLC:32382748 |
ISBN-13 |
: |
Rating |
: 4/5 (48 Downloads) |
Synopsis A Summary of the Phase II - Title I Engineering Assessment of Inactive Uranium Mill Tailings by : Ford, Bacon & Davis Utah Inc